RIIMEX504 – RPL Candidate Self-Assessment & Reporting
Instructions for Use
- Complete your Candidate Details below.
- Score each question: 2=Very Experienced, 1=Some Experience, 0=No Experience, and add notes and evidence.
- Watch your score update in real-time in the Results panel.
- Click Send Results by Email when complete to receive a copy.
Scoring Guide:
- 0 – No Experience
- 1 – Some Experience
- 2 – Very Experienced
Live Results
Total Score
0 / 56
Eligibility Status
Not Yet Ready
1. Plan & Prepare to Implement the GCMP
I interpreted the site Ground Control Management Plan (GCMP) and ensured all related work met legislative and site standards.
I reviewed historical and current ground control data to assess geotechnical conditions before operations.
I identified hazards and environmental factors affecting ground stability and put suitable controls in place.
I determined and allocated resources (people, plant, systems) required to implement the GCMP effectively.
I communicated the GCMP to relevant personnel, including responsibilities and emergency protocols.
I identified team training needs and developed practical training plans to support GCMP implementation.
I confirmed emergency procedures and prepared to respond to ground control incidents.
Section Score
0 / 14
2. Evaluate Geotechnical Design & Control Measures
I reviewed the geotechnical design and pit development plan to ensure compliance with stability/design parameters.
I assessed extraction methods and pit operations to confirm they maintain ground control and slope stability.
I evaluated stockpile and dump operations for appropriate stability controls.
I reviewed groundwater and surface water control systems for their impact on slope performance.
I developed or refined workplace procedures for applying the GCMP and documented responsibilities.
Section Score
0 / 10
3. Implement & Monitor the GCMP
I implemented approved extraction and slope design methods in line with the GCMP and geotechnical standards.
I used monitoring systems (survey, radar, prisms, crack meters, inspections) to track ground movement and report findings.
I monitored hazards and verified that control measures remained effective over time.
I recorded and reported activities, issues and corrective actions in accordance with site requirements.
I applied emergency response and evacuation plans when adverse conditions or failures occurred.
Section Score
0 / 10
4. Investigate & Respond to Adverse Ground Conditions
I reviewed geotechnical inspection reports and identified trends or adverse ground conditions.
I inspected problem areas to confirm findings and evaluate control effectiveness.
I led or participated in risk assessments with the team to decide on safe, practical controls.
I engaged external specialists/consultants when higher-level expertise was required.
I implemented and monitored corrective actions and updated procedures/plans based on findings.
I communicated geotechnical risks and remedial measures to affected personnel.
Section Score
0 / 12
5. Audit & Review the GCMP
I reviewed and audited GCMP performance for safety, effectiveness and compliance.
I contributed to formal audits and recommended improvements to the GCMP.
I reviewed emergency response/evacuation drills and verified adequacy and readiness.
I developed and submitted improvement actions to strengthen slope stability management.
I documented and presented audit/review findings with action owners and due dates.
Section Score
0 / 10
Interpretation Matrix
| Score Range | Eligibility Outcome | Recommended Pathway |
|---|---|---|
| 45–56 (80–100%) | Fully RPL Ready | Direct RPL workshop – minimal support required. |
| 36–44 (65–79%) | Slightly Assisted RPL | Guided RPL workshop – some evidence support needed. |
| Below 36 (<65%) | Not Yet Ready for RPL | Gain additional experience or training before RPL. |
Complete Your Assessment
Ready to receive your detailed assessment results? Click below to send your results via email.
Results will be sent to the email address you provided above.