RIIRAI601D – RPL Candidate Self-Assessment & Reporting
Instructions for Use
- Complete your Candidate Details below.
- Score each question: 2=Very Experienced, 1=Some Experience, 0=No Experience, and add notes and evidence.
- Watch your score update in real-time in the Results panel.
- Click Send Results by Email when complete to receive a copy.
Scoring Guide:
- 0 – No Experience
- 1 – Some Experience
- 2 – Very Experienced
Live Results
Total Score
0 / 94
Eligibility Status
Not Yet Ready
Compliance, scope and feasibility (planning foundations)
I have located, interpreted and applied site infrastructure and fixed plant documentation (standards, procedures, drawings, specifications) to ensure the work was compliant.
I have clarified and confirmed the scope, objectives, constraints and success criteria for infrastructure and/or fixed plant changes.
I have identified hazards, risks and environmental issues, and implemented controls for planning and decision-making activities.
I have consistently applied appropriate PPE and site safety requirements when conducting inspections, site visits and verification activities.
I have experience completing or confirming feasibility analysis for infrastructure and/or fixed plant proposals (technical, operational, financial).
I have identified required statutory/legal approvals and progressed or confirmed approval applications relevant to the proposal.
I have experience conducting or coordinating title searches and using outcomes to inform planning and risk controls.
I have developed detailed plans, budgets and financial models consistent with feasibility outcomes.
I have estimated business plan impacts and financial benefits (CAPEX/OPEX, productivity, risk reduction, lifecycle costs) from infrastructure/plant changes.
I have collected and analysed strategic resource planning information to support executive decision-making (people, equipment, services, time).
Section Score
0 / 20
Developing the detailed infrastructure proposal
I have identified and interpreted legislative, statutory and site requirements that apply to site infrastructure development/changes.
I have defined the purpose and performance requirements of infrastructure items aligned to site design and the system of mining/extraction.
I have developed fit-for-purpose specifications for infrastructure items based on comprehensive site requirements analysis.
I have identified and compared infrastructure options using technical, operational and financial information.
I have selected preferred infrastructure options based on projected performance against specifications and whole-of-life considerations.
I have experience conducting site visits to confirm infrastructure routes/sites/capacities and capturing outcomes on the site plan/drawings.
Section Score
0 / 12
Developing the detailed fixed plant proposal
I have identified and interpreted legislative, statutory and site requirements that apply to fixed plant selection, location, installation and operation.
I have defined the purpose, duty and performance requirements of fixed plant aligned to site design and the system of mining/extraction.
I have identified supporting mobile plant requirements needed to enable the fixed plant system (interfaces, capacities, constraints).
I have developed fixed plant specifications from a comprehensive analysis of site requirements and manufacturer/supplier information.
I have identified and compared fixed plant options using relevant technical, operational and financial data.
I have selected preferred plant options based on projected performance against specification requirements, reliability and maintainability.
I have experience conducting site visits to confirm potential fixed plant locations and recording outcomes on site plans/drawings.
Section Score
0 / 14
Business case, endorsement and approvals (governance)
I have prepared detailed infrastructure proposals including components, layout, specifications and costs suitable for endorsement/approval.
I have prepared detailed fixed plant proposals including specifications, locations and costs suitable for endorsement/approval.
I have prepared proposals for supporting plant and associated costs (interfaces, enabling works, commissioning needs).
I have prepared requirements for fixed plant/infrastructure within a general site development proposal and submitted to the organisation/board/executive for endorsement.
I have experience obtaining formal approvals in line with enterprise governance and documenting conditions of approval.
I have updated records and controlled documents to reflect approval conditions and finalised documentation ready for implementation.
I have prepared and presented management reports that clearly communicate options analysis, risks, costs, benefits and recommendations.
Section Score
0 / 14
Audit, review and continual improvement (maintaining the system)
I have established audit/review procedures and schedules for site infrastructure and fixed plant systems.
I have identified and assessed future system and equipment requirements and incorporated these into forward planning and business planning processes.
I have established practical processes for capturing feedback (from workers, maintainers, operations, OEMs, stakeholders) and integrating it into reviews.
I have established and applied procedures to respond to non-compliance, discrepancies or deficiencies identified through audits/reviews.
I have used maintenance surveys/condition information and operational performance data to drive improvements and justify changes.
Section Score
0 / 10
Knowledge evidence self-check (underpinning knowledge for RIIRAI601D)
I understand legislative, organisational and site requirements and procedures for risk management in infrastructure/fixed plant decisions.
I understand statutory/legal control requirements relevant to infrastructure/fixed plant (approvals, compliance obligations, governance).
I understand how surveying and site design information is used to plan infrastructure routes, locations and capacities.
I understand titles management and how tenure/land access constraints impact proposals and approvals.
I understand organisational change and development principles to implement change with minimal operational disruption.
I have applied project management methods to plan, schedule, budget, monitor and control infrastructure/fixed plant initiatives.
I have used relevant computer applications (e.g., spreadsheets, planning tools, document control systems) to develop and manage proposals and records.
I have built and interpreted financial models for CAPEX/OPEX, lifecycle costing, ROI and sensitivity analysis.
I understand mining/extractive operations, plant and equipment capabilities/limitations and how these drive infrastructure and fixed plant requirements.
I have applied negotiation techniques with internal stakeholders, suppliers, community and statutory/legal authorities when required.
I understand organisational objectives, planning and strategic management and how infrastructure/fixed plant decisions support production and risk outcomes.
I have performed resource quantification (people, equipment, materials, services, time) for implementation planning and business cases.
Section Score
0 / 24
Interpretation Matrix
| Score Range | Eligibility Outcome | Recommended Pathway |
|---|---|---|
| 75–94 (80–100%) | Fully RPL Ready | Direct RPL workshop – minimal support required. |
| 61–74 (65–79%) | Slightly Assisted RPL | Guided RPL workshop – some evidence support needed. |
| Below 61 (<65%) | Not Yet Ready for RPL | Gain additional experience or training before RPL. |