RIIMEX602D – RPL Candidate Self-Assessment & Reporting
Instructions for Use
- Complete your Candidate Details below.
- Score each question: 2=Very Experienced, 1=Some Experience, 0=No Experience, and add notes and evidence.
- Watch your score update in real-time in the Results panel.
- Click Send Results by Email when complete to receive a copy.
Scoring Guide:
- 0 – No Experience
- 1 – Some Experience
- 2 – Very Experienced
Live Results
Total Score
0 / 62
Eligibility Status
Not Yet Ready
1. Plan and Prepare for Ground Control & Slope Stability
I reviewed all relevant ground control / slope stability documentation and site procedures to ensure compliance.
I confirmed work requirements and gathered required mine survey, geological, geotechnical and historical failure data.
I identified key risks and environmental factors affecting ground control and implemented practical control measures.
I determined the people, equipment and budget needed to assess and manage slope stability issues.
I reviewed actual and predicted slope performance data to inform system design and improvements.
I identified measurable criteria for acceptable slope performance and design compliance.
Section Score
0 / 12
2. Geological & Geotechnical Evaluation
I accessed and interpreted geological, geotechnical, hydrological and hydrogeological data relevant to the site.
I coordinated exploration, monitoring, sampling or testing to assess ground control and slope stability conditions.
I identified potential ground movement or instability areas and assessed their risk and impact.
I evaluated overburden and inter-seam material properties for their influence on stability.
I analysed stress regimes, blast vibration and seismic activity for potential failure triggers.
Section Score
0 / 10
3. Mining Engineering Methods & Constraints
I evaluated how mining system types and methods affect ground control and slope stability.
I assessed alternative pit layouts/designs to improve stability from an engineering perspective.
I identified mining/geotechnical constraints that limit stability options or development approaches.
I determined equipment requirements to maintain ground control and monitor performance.
Section Score
0 / 8
4. Control Options & Management
I identified water management methods that improve ground control and reduce slope failure risk.
I selected and evaluated ground support systems or mining methods to provide appropriate stability.
I established monitoring and assessment systems to track ground movement and support effectiveness.
I developed management controls and response actions for unacceptable ground movement or instability.
Section Score
0 / 8
5. Establish the Ground Control & Slope Stability System
I developed exploration/investigation programs to identify geological features impacting stability.
I established safe access and egress methods for highwalls, lowwalls, ramps and working areas.
I defined sequences and systems of safe mining to maintain stable ground conditions.
I set up monitoring systems to warn, control operations and record ground movement events.
I prepared and implemented training plans/programs for supervisors, operators and contractors.
I established emergency response and evacuation plans for slope failure/instability scenarios.
I documented and implemented safe operating procedures relevant to ground control.
Section Score
0 / 14
6. Audit & Review System Effectiveness
I monitored ground movement and stability measurements against defined design standards.
I audited emergency response and evacuation plans and verified readiness and compliance.
I incorporated future mining requirements into ongoing stability planning and design updates.
I established procedures to respond to non-compliance or deficiencies identified by audits.
I regularly reviewed system performance and recommended improvements based on results.
Section Score
0 / 10
Interpretation Matrix
| Score Range | Eligibility Outcome | Recommended Pathway |
|---|---|---|
| 50–62 (80–100%) | Fully RPL Ready | Direct RPL workshop – minimal support required. |
| 40–49 (65–79%) | Slightly Assisted RPL | Guided RPL workshop – some evidence support needed. |
| Below 40 (<65%) | Not Yet Ready for RPL | Gain additional experience or training before RPL. |
Complete Your Assessment
Ready to receive your detailed assessment results? Click below to send your results via email.
Results will be sent to the email address you provided above.